NCBartramTrail.org

Official Website of the North Carolina Bartram Trail Society

Photos from Ledbetter Creek Bridge Work Hike

September 3rd, 2008 by NC BTS

Last weekend (August 30, 2008) a group of NCBTS Workhikers started building a bridge on Ledbetter Creek. We have published some photos from the work hike below. If you’re intersted in joining the NCBTS on a workhike, check out our Help The Trail page.  NHC’s Don O’Neil and Gail Lehman at lunch break at Ledbetter Creek BridgeNHC’s Don O’Neil and Gail Lehman at lunch break at Ledbetter Creek Bridge Keith Day and Charlie Edwards at lunchKeith Day and Charlie Edwards at lunch L to R: Keith, Tim, Charlie, Don, Gail. Photo by Dave ReidL to R: Keith, Tim, Charlie, Don, Gail. Photo by Dave Reid  Dave Reid at Ledbetter Bridge site prepDave Reid at Ledbetter Bridge site prep L: First Bridge User - exercise runner on Sat. Aug 30; R: Charlie EdwardsL: First Bridge User – exercise runner on Sat. Aug 30; R: Charlie Edwards  Tim drilling holes for threaded tie rods, as Keith Day looks on; photo by Dave ReidTim drilling holes for threaded tie rods, as Keith Day looks on; photo by Dave Reid  L to R: Charlie Edwards, Keith Day, Gail Lehman (NHC) and Don O’Neil (NHC) L to R: Charlie Edwards, Keith Day, Gail Lehman (NHC) and Don O’Neil (NHC) BTS Trail crew member Dave Reid drills holes for threaded tie rods to strengthen bridgeBTS Trail crew member Dave Reid drills holes for threaded tie rods to strengthen bridge Upstream view of BTS Bridge over Ledbetter Creek on Sunday, Aug 31, 2008; L to R: Keith Day, Dave Reid; Photo by Tim WarrenUpstream view of BTS Bridge over Ledbetter Creek on Sunday, Aug 31, 2008; L to R: Keith Day, Dave Reid; Photo by Tim Warren First Sunday hikers across bridge with handrails First Sunday hikers across bridge with handrails  Sunday Bridge crew: Dave Reid, Keith Day and Tim Warren. Photo by passing hikerSunday Bridge crew: Dave Reid, Keith Day and Tim Warren. Photo by passing hiker  Ledbetter Creek Bridge on the NCBT Section 7 nearing completion; photo by Tim WarrenLedbetter Creek Bridge on the NCBT Section 7 nearing completion; photo by Tim Warren 

This entry was posted on Wednesday, September 3rd, 2008 at 7:39 am and is filed under Photos, Workhikes. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply